Production trend
Weekly output vs plan
Feet extruded per week (bars) against the production plan (line). Weeks below plan are shaded.
Signature view · 800 Woodlands Pkwy
Plant floor — extrusion lines by OEE, live from the same filters
Each line is drawn extruder → cooling trough → take-up reel; the coloured run length is the line's OEE for the selected period. Dimmed lines are filtered out.
Ranking
OEE by extrusion line
Availability × Performance × Quality. Target 78%. Sorted lowest first — the morning meeting starts at the top.
Inventory
Inventory days by product family
Finished-goods cover at period end vs. the 35-day target.
Demand
Open orders by customer segment
Feet on open sales orders at period end, by the market the distributor serves.
Ask the data · Copilot-style layer (mock)
Plain-English questions, answered from the model
What you'd learn to build · one-on-one Power BI training
Three report pages, built with your team, on your data
Production
Output vs plan by line and shift, OEE with A/P/Q breakdown, downtime reasons.
- Connect: ERP work orders + line PLC/log sheets
- Learn: Power Query, date table, DAX measures
Quality
Scrap % by line and cause code, first-pass yield, food-grade lot traceability.
- Connect: QC inspection log, scrap tickets
- Learn: relationships, conditional formatting, drill-through
Shipping & inventory
On-time shipment by distributor, open orders by segment, inventory days by family.
- Connect: order book + warehouse stock snapshot
- Learn: row-level security, scheduled refresh, mobile layout
Everything on this page was built with the same visuals your team would build — no custom code needed inside Power BI.













